Skip to main content

Overhead Costs - List

The Overhead Costs list holds the lines one calculation schema is made of. Each row is a step in the costing: a surcharge on material, a total, a contribution margin, a deduction from the sales price.

The list belongs to the schema it was opened from, and the breadcrumb leads back to it.

alt text

Default Columns​

ColumnDescription
BitmapThe icon assigned to the line.
DesignationWhat the line is, as it appears in the calculation.
TypeWhat the line does: Surcharge, Total Material, Total Production, Grand Total, Sales Price as Entered, Contribution Margin (€), Contribution Margin (%), Contribution Margin (hrs), Deduction from Sales Price, Remaining Sales Price, Material Costs excl. Subcontracting or Subcontracting Costs.
Calculate in PrecalculationCheck mark when the line is calculated in a precalculation.
Calculate in PostcalculationCheck mark when it is calculated in a postcalculation.
Visible TimeCheck mark when the line's time is shown.
Precalculation DefaultCheck mark when the line is proposed by default in a precalculation.

Additional Columns​

Hidden columns are available in the tool bar settings ().

ColumnDescription
ColorThe color assigned to the line, applied to its designation.
QuestionThe question asked for the line when the calculation runs.
ValueThe line's value.
Marginal Cost %Percentage applied to the marginal cost.
Full Cost %Percentage applied to the full cost.
Market Cost %Percentage applied to the market cost.
Booking No.The line's booking number within the schema.
ModifiedDate and time the line was last changed.
Modified ByUser who last changed it.