Resource Group - Detail

The Resource Group detail page is where you can access information of a group and the resources it bundles together. Here you can get an overview on various pieces of information: general, appearance, and resource related data, as well as scheduling information and custom fields.

Resource Group detail

Opening the page​

  1. Open the Resource Groups list (it has no launchpad tile — reach it from the Group column of the Resources list).
  2. Click an existing group to open.

From the toolbar you can also Duplicate the group or jump to View All Resources of the group in the Resources list.

The header shows the group's code and description, plus a set of capacity facets:

FacetDescription
Active ResourcesNumber of resources currently in the group.
Planned CapacityTotal planned capacity of the group, in hours.
Placeholder ResourceThe group's placeholder resource code. Shown only when a placeholder is set.
Last ModifiedDate and time the group was last changed.

Body​

General Information​

FieldDescription
GroupRequired. The group's unique code. Set on creation, not changed afterwards.
DescriptionDescription of the group.

Appearance​

Controls how the group is shown throughout the application.

FieldDescription
IconAn icon for the group, chosen from the icon picker.
ColorA color for the group, chosen from the color picker.

Group Placeholder​

A group can have a placeholder resource — a stand-in that operations are planned against when any resource in the group may do the work, letting the scheduler pick the actual machine later. This section lets you assign the placeholder and, when none exists yet, create one for the group. It is shown once the group has a code.

Resources​

Lists the resources that belong to the group. Use New Resource to add a resource to the group; each row can be edited or removed from its row actions. The grid also shows key cost and capacity figures per resource:

ColumnDescription
ResourceResource code. Links through to the resource's own detail page.
DescriptionDescription of the resource.
Service/costsMarked when the resource is an outsourced (external) work center.
Marginal Cost RateMarginal (overhead) processing cost rate of the resource.
Full Cost RateFull processing cost rate of the resource.
Planned CapacityDaily capacity of the resource, in hours.
Empl/No.Number of machines or people the resource represents.
GroupThe group the resource belongs to.

Scheduling​

The group's planning calendar. It is shown once the group has a code and lets you review the group's capacity over time. Individual capacity is maintained on each member resource.

Custom Fields​

If your company has defined extra user fields for resource groups, they appear in a Custom Fields section. This section is shown only when such fields exist.

tip

The order groups appear in can be set from the Resource Groups list with Reorder Groups, and the way a group's member resources are sequenced for automatic optimization is maintained with the Optimization Sequence action.